Quote:
Originally Posted by Ximian
After a while being scheduled, the status for my car switched to "Production Begins" and I have a VIN. Found the old posts on rough duration of each stage, but I think the pandemic may have slowed things down quite a bit.
For anyone further along their order, approximately how long did it take to go from production start to "Ready for transport"?
|
Mine was ~10 days from 'production begins' to 'at the port'. It's been sitting at the port for ~5 days now.
All of that is according to the MyBMW website (picture included). I never talked to any person at BMW to get more detail.